1
/
of
4
Auto Parts Tokyo
Withings Body Cardio Smart weight scale made in France, white Wi-Fi/Bluetooth compatible, heart health check (heart rate/vascular age) & body composition meter [Authorized Japanese distributor product] WBS04-WHITE-ALL-ASIA
Withings Body Cardio Smart weight scale made in France, white Wi-Fi/Bluetooth compatible, heart health check (heart rate/vascular age) & body composition meter [Authorized Japanese distributor product] WBS04-WHITE-ALL-ASIA
Regular price
$211.00 USD
Regular price
Sale price
$211.00 USD
Unit price
/
per
Shipping calculated at checkout.
Condition: New
Couldn't load pickup availability
[Smart Body Composition Meter] New design, groundbreaking technology Smart Body Composition Meter that puts your heart health first [Best Accuracy in its Class] In addition to weight, BMI, body fat, water percentage, bone [Highly accurate weighing] Highly stable weighing scale in 100g increments [Long-lasting battery] Can be used continuously for up to 12 months [Baby mode] Equipped with baby mode and pregnancy mode to track the health of your baby Possible [Heart health check] Calculate heart rate and blood vessel age and record changes with the app
This product is a wireless device that complies with the technical standards of the Radio Law The box and receipt are required for returns and exchanges due to product defects, so please keep them on hand even after purchase.softbankselection.jp/product/pdf/detail/maker_info1207.pdf
Color: White
Battery included: Yes
Battery used: Yes
Brand name: Withings
Manufacturer: Withings
Product model number: WBS04-WHITE-ALL-ASIA
Released Year: 2018
Accessories: USB cable
Connection method: Bluetooth, Wi-Fi
Material: Aluminum
Product size: 12.87 x 12.87 x 0.91 cm; 3.7 kg
>Product weight: 3700 grams
This product is a wireless device that complies with the technical standards of the Radio Law The box and receipt are required for returns and exchanges due to product defects, so please keep them on hand even after purchase.softbankselection.jp/product/pdf/detail/maker_info1207.pdf
Color: White
Battery included: Yes
Battery used: Yes
Brand name: Withings
Manufacturer: Withings
Product model number: WBS04-WHITE-ALL-ASIA
Released Year: 2018
Accessories: USB cable
Connection method: Bluetooth, Wi-Fi
Material: Aluminum
Product size: 12.87 x 12.87 x 0.91 cm; 3.7 kg
>Product weight: 3700 grams
Share
![Withings Body Cardio Smart weight scale made in France, white Wi-Fi/Bluetooth compatible, heart health check (heart rate/vascular age) & body composition meter [Authorized Japanese distributor product] WBS04-WHITE-ALL-ASIA](http://megashopjapan.com/cdn/shop/files/71JlBwSSdsS._AC_US1000.jpg?v=1714676078&width=1445)