1
/
of
4
Auto Parts Tokyo
Nittaku Table Tennis Rubber Water Soluble Adhesive E-Zip Commercial Use (Smooth Type) NL-9103
Nittaku Table Tennis Rubber Water Soluble Adhesive E-Zip Commercial Use (Smooth Type) NL-9103
Regular price
$94.00 USD
Regular price
Sale price
$94.00 USD
Unit price
/
per
Shipping calculated at checkout.
Condition: New
Couldn't load pickup availability
Capacity: 1000ml Country of Manufacture: Germany Officially recognized by Japan Table Tennis Association (official number 231112NTGL01)
Features: Smooth type adhesive that is easy to apply and does not damage the racket when removing the rubber. Technology ●E-zip is exposed on the rubber sponge surface. Amount: 1 gram (about the size of a 500 yen coin) - Hold the included sponge with a clip and apply evenly. ●Apply E-zip to the racket as well. ●After the applied E-Zip dries from white to transparent, paste the racket rubber and cut the rubber with scissors.
Product model number: NL-9103
Size: 1000ml
Package size: 20.6 x 9.5 x 9.3 cm; 1.09 kg
Features: Smooth type adhesive that is easy to apply and does not damage the racket when removing the rubber. Technology ●E-zip is exposed on the rubber sponge surface. Amount: 1 gram (about the size of a 500 yen coin) - Hold the included sponge with a clip and apply evenly. ●Apply E-zip to the racket as well. ●After the applied E-Zip dries from white to transparent, paste the racket rubber and cut the rubber with scissors.
Product model number: NL-9103
Size: 1000ml
Package size: 20.6 x 9.5 x 9.3 cm; 1.09 kg
Share



